Prefabrication is only part of the project. A coordinated site and carefully planned delivery put your module in the right place.

Delivery & installation by No1Pool

Installation & connections

Above-ground, partially recessed or fully recessed installation, subject to local and technical conditions.

The plant room is integrated beneath the platform by the container door; no separate externally attached plant room is planned.

Provide a level, load-bearing, professionally compacted gravel base. Grain size 16/32 or 26/32 is subject to site conditions and technical assessment. Any additional foundation requirements are assessed for the site.

Delivery by truck or suitable trailer depending on access. The client arranges and pays for unloading by crane or excavator; we assist with planning.

The electrical cabinet is pre-installed. Site electrical connections are made by the client’s qualified electrical contractor.

GOOD TO KNOW

Space for your questions.

Practical answers for the next planning step.

Is a crane always included in the quotation?

This depends on the agreed scope of supply. The supplied outdoor kitchen catalogue assigns the crane and its operator to services arranged by the customer.

How long does installation take?

The duration depends on the module, site, preparation and connection work. A firm schedule can only be agreed after technical and logistical coordination.